Archived link

Laying out key priorities for the EU’s upcoming Clean Industrial Deal, German Economy State Secretary Sven Giegold said on Monday (30 September) he wants the Commission to prioritise renewable energy, taking a tough line on nuclear power and France’s renewable targets.

Alongside a quicker roll-out of renewable energy facilitated by “further exemptions from [environmental impact] assessments,” Giegold outlined several other German priorities for the EU’s upcoming strategy.

Based on the 2030 renewable energy targets, the EU should also set up a 2040 framework, complemented by new, more ambitious targets for energy efficiency, he said.

“It should include new heating standards, a heat pump action plan and a renovation initiative,” he explained, noting a heat pump action plan was last shelved in 2023.

Hydrogen, made from renewables, should be governed by a “a pragmatic framework,” the German politician stressed, reiterating calls from his boss, Economy Minister Robert Habeck (Greens), to delay strict production rules into the late 2030s.

  • Successful_Try543@feddit.org
    link
    fedilink
    English
    arrow-up
    9
    arrow-down
    2
    ·
    edit-2
    2 months ago

    For information:

    A significant inflow of water and a subtle loss of mechanical stability may jeopardise the underground mine integrity – the site is in danger of collapsing and becoming flooded.

    Between 1988 and 2008 32 new entry points were recorded. In 1996, the BFS notified the Bundesumweltministerium that there was a risk of severe radioactive contamination if the mine ran full of water and that further investigation was urgently required.

    After the controversies about the facility became public and the operator was changed to the Federal Office for Radiation Protection, a new plan was developed in 2010. It became obvious that the recovery of the waste is necessary for long-term safety. The waste is planned to be collected by remotely controlled robots, sealed in safe containers, and stored temporarily above ground. Preparations include creating a new shaft that will be big enough and building the above ground storage facility. The estimated costs for the closure of the mine are estimated to be at least 3.7 billion Euro. The recovery of the waste and closure of the mine will be paid with tax money, not by the operators of the German nuclear plants, even though most of the waste was created by them. The beginning of the recovery is planned to start in 2033 and is estimated to last for decades.

    https://en.wikipedia.org/wiki/Asse_II_mine

    Edit: Wow. I’m getting downvotes for providing additional information. Teriffic!

    • Thorry84@feddit.nl
      link
      fedilink
      English
      arrow-up
      1
      arrow-down
      3
      ·
      2 months ago

      Yeah the anti-nuclear crowd just goes and downvote all the things, they don’t even read anything. It’s kinda sad.