See, Apple? Even cars can do it :)

  • @[email protected]
    link
    fedilink
    English
    712 days ago
    1. Book a swap in the app
    2. arrive in the lineup.
    3. serves one car at a time like an oil change
    4. the station has to constantly be charging the used batteries.

    Or

    Install 4-6 high speed chargers in the same spot and clear more cars faster .

    Essentially the swap station is only better if you arrive without a lineup. The swap takes 7-10min and is manned. If you are one or two cars deep waiting you are better to have just found a charger

    • @[email protected]
      link
      fedilink
      English
      811 days ago

      Why wouldn’t you compare like situations? It appears you chose a rather well set-up charging station vs. a poorly setup swapping station.

      I didn’t picture an oil change when I imagined a battery swap station, I am not sure that should be the default or starting point.

      • @[email protected]
        link
        fedilink
        English
        211 days ago

        neo is the ONLY company doing swap stations, and that is how they work… I also described current, available EVs with available chargers.

    • @Gsus4OP
      link
      English
      512 days ago

      True, mass parallel charging can fulfill more peak demand faster, but from the point of view of the user, it would still be good to have the option to fill/exchange the battery quickly.

      • @[email protected]
        link
        fedilink
        English
        511 days ago

        An EV6 on an capable fast charger can do 10% to 80% in 17 min

        They need to make the swap faster / higher throughput or charging is still going to make more sense .

        • @Gsus4OP
          link
          English
          3
          edit-2
          11 days ago

          One thing that would speed it up would be if you could just drop the 1-ton battery by gravity (safely, which I understant is hard on the edges of any hooks holding it, maybe they could use a raised floor, which is what they do in NIO) and snap it back on in 30s or less for a total of 2m. The rest is just your usual parking, pulling the gas hose. Maybe make it go-through so you don’t have to manouver into place.

    • @[email protected]
      link
      fedilink
      English
      111 days ago

      More like install 8 to 12 DCFS at a minimum and some very busy stations have a massive amount of chargers.