• @[email protected]
    link
    fedilink
    911 months ago

    Octember it will be after October. The names will be just as incorrect as they have been for way too long but if anyone wanted the names and order to correspond to their own meaning it would have been fixed by now.

    • @[email protected]
      link
      fedilink
      23
      edit-2
      11 months ago

      If we change the number of months, the names of the off-by-two months (September through December) are getting fixed too. It’s better to fix all of the technical debt at the same time.

      • @BetterDev
        link
        811 months ago

        Found the software engineer

    • @[email protected]
      link
      fedilink
      111 months ago

      at the risk of sounding like a weirdo, does anyone else remember a book called the First of Octember? it was written and illustrated as though it was a Dr Suess story, but apparbely it wasnt