You know, we’re not required to do that but because of you I just ordered some locks and labels for the field kit (edit: as well as breaker locks).
Our stuff is always temp (8-12mo) and on a dedicated line. The sites we’re on always involve coordinating with the clients appropriate people and specifically stating we’re not trained in this to their standards (which is why I know some of this stuff but not to the letter), but an extra layer is always a good idea. No harm ever came from an extra lock that couldn’t be fixed.
Thanks.
edit: for the record it’s not like we’re negligent, everything in our system is designed to fail-safe, and we compartmentalize power delivery, but still, no harm in a few extra items in the kit.
You know, we’re not required to do that but because of you I just ordered some locks and labels for the field kit (edit: as well as breaker locks).
Our stuff is always temp (8-12mo) and on a dedicated line. The sites we’re on always involve coordinating with the clients appropriate people and specifically stating we’re not trained in this to their standards (which is why I know some of this stuff but not to the letter), but an extra layer is always a good idea. No harm ever came from an extra lock that couldn’t be fixed.
Thanks.
edit: for the record it’s not like we’re negligent, everything in our system is designed to fail-safe, and we compartmentalize power delivery, but still, no harm in a few extra items in the kit.