• gaiussabinus@lemmy.world
    link
    fedilink
    arrow-up
    1
    ·
    8 months ago

    Both substations feed in parallel. Demand exceeded the capacity of station 2 to supply demand and it tripped the cutout. Only rural connections are radial. Electrical utility starts at the point of demarcation to the generators that make the power.