• Zink
    link
    fedilink
    English
    arrow-up
    7
    ·
    7 months ago

    A couple decades ago I worked at a place that did power generation turbine controls.

    One thing I worked on was a redundant sync check for connecting turbines to the grid. A turbine has to be brought up to speed, about 3600rpm in the US, before being connected to the grid. The sine wave coming out of the generator needs to match the sine wave on the grid.

    If they are mismatched when the huge breaker closes, it’s not a shock or fire hazard, it’s an explosion hazard.