• bane_killgrind@lemmy.ml
    link
    fedilink
    English
    arrow-up
    2
    ·
    4 months ago

    Yeah he fucked up. There should be a drainage plan for the build.

    If a drainage plan isn’t required for the build in your area, he should have asked for it before agreeing.

    In my area, any new structure with a foundation has a drainage plan page or grading marked on the drawings submitted for permit.