• Transporter Room 3@startrek.website
    link
    fedilink
    arrow-up
    10
    ·
    3 months ago

    I would scale a 3 floor building by climbing down balconies before I call maintainence to let me out. Or toss some rope out the window and climb down I guess.

    But I think I would even try taking the entire handle off before calling maintenance. Or even straight up texting a family member and waiting a few hours.

    My wife, on the other hand, is the “I tried to wiggle it lightly a few times so now I am giving up”. Installed a new light last week, and it takes a split second to actually turn on. In the literal 600-800ms it takes to charge up, she flipped the switch 3 or 4 times, and loudly yelled about how the piece of shit we bought doesn’t work. I simply went over and flipped the switch up and left it there to actually power up.

    People like that 100% exist.

    • chicken@lemmy.dbzer0.com
      link
      fedilink
      arrow-up
      7
      arrow-down
      1
      ·
      3 months ago

      tbf I would definitely consider an 800ms delay on a light bulb as that light bulb not working and needing to be replaced

    • astrsk@fedia.io
      link
      fedilink
      arrow-up
      2
      ·
      3 months ago

      Taking the handle off is exactly what I’d do, no need to scale the side of a building lmao.