Two of the three new UPSs arrived, and I’m going to go ahead and swap them in versus waiting for the third one. I’ll just have to deal with a little extra planned downtime later to install the 3rd one since there’s too much potential for unplanned downtime with the two faulty ones in place now.

Shooting for 6 pm or very close to that. I’m going to cable-manage a bit, so planning for between 10 and 30 minutes of downtime.