• flamboyantkoala
    link
    fedilink
    arrow-up
    2
    ·
    1 year ago

    Interesting you prioritized pointing out on time delivery as opposed to maximum value.

    Hits a sore spot, I’ve delivered a lot of useless stuff on time with agile teams. We could have been useless even faster without the meetings.

    • sheogorath@lemmy.world
      link
      fedilink
      arrow-up
      2
      ·
      1 year ago

      Hey, the one responsible to maximize the value is the Product Owner, not the devs. We’re only responsible in taking the PBIs in the backlog that’s ordered based on value and delivering it. Whether it is really valuable or not is the responsibility of the Product Owner.