Not sure if anything is actually needed. It just looks unstable. Power is already run to the shed, so it might be difficult to move and do a full concrete pour. I was thinking of lifting with a car jack and finding a better combination of pavers to remove the wood wedges, but I’m open to any ideas. And it is on a slope, the other end is on pavers on the ground. This stack of pavers was the previous owners attempt at levelling I guess.
dict tape ought to fix it, I’d reckon