• ano_ba_to@sopuli.xyz
    link
    fedilink
    arrow-up
    4
    ·
    2 months ago

    There are ways to know. Did the manager ask for proof of concept? Asked for performance tests of the update and compared it to existing/baseline?

    • Lembot_0006
      link
      fedilink
      arrow-up
      1
      arrow-down
      3
      ·
      2 months ago

      Did the manager ask

      How can I know? Plus engineer could easily lie as he did it right from the start.

      • ano_ba_to@sopuli.xyz
        link
        fedilink
        arrow-up
        3
        ·
        2 months ago

        Of course don’t just ask the engineer. Any piece of code written by the engineer should ultimately be tested by a separate testing team before getting pushed to production. Ideally you have a performance and regression testing team that would help evaluate the changes being introduced and how it compares with the existing.